1 inch PVC reducing coupling for water supply Schedule 40 ASTM D2466

1 inch PVC reducing coupling for water supply Schedule 40 ASTM D2466
Item NO: Drain

Schedule 40 PVC long reducers are used in confined spaces to connect different sizes
PVC pipe.

Order

    Quick Help: Contact one of our experts and we'll get back to you in 24 hours!

    Order

      Quick Help: Contact one of our experts and we'll get back to you in 24 hours!

      YouTube
      Instagram
      WhatsApp

      Application

      Construction pipeline system

      Agricultural irrigation pipeline system

      Pool pipeline system

      Industrial pipeline system

      Water treatment pipeline system

      Fishery aquaculture pipeline system

      Advantages

      The characteristics of PVC material: stable physical properties, and not suitable for acid and alkali corrosion, relatively heat-resistant. By adding different additives, PVC materials can present different physical and mechanical properties

      Benefits
      Long service life
      Electrical insulation
      Good impact elasticity
      Good chemical resistance
      Easy to operate
      light in weight

      The Dura Plastic Products 1 in. Schedule 40 PVC Tee features 3 slip connections. It can withstand a maximum of 270 PSI working pressure. It can be used to connect pipes with matching diameters.

      Schedule 40 PVC requires a primer before cementing

      Use to join a branch line with a schedule 40 main line

      Join by solvent welding

      Withstands up to 270 PSI working pressure

      Injection molded

      Do not test or use with compressed air or gas, or compressed air or gas systems

      Dimensions

      • Left Side Size 1″
      • Product Depth (in.) 3.66
      • Product Height (in.) 2.58 in
      • Product Length (in.) 3.66 in
      • Product Width (in.) 1.66 in
      • Right Side Size:1″

      Details

      • Application:Water Supply
      • Compatible Pipe Material:PVC
      • Connectivity:Standard

      Features

      Underground Rated
      • Fitting or Connector Type:Tee or Wye
      • Fitting/ Connector Collection:PVC
      • Left Side Connection:Slip-Joint
      • Material:PVC
      • Maximum Working Temperature (F):140
      • Maximum working pressure (psi):270
      • Pipe or Fitting Product Type:Fittings & Connectors
      • Product Weight (lb.):0.17 lb
      • Right Side Connection:Slip-Joint
      • Type:Standard

      FAQ 

      1.What is your MOQ?
      Our MOQ is usually 5 CTNS.
      2.What is your delievery time?
      The time of delievery is around 30-45days.
      3.What is the shipping port?
      We ship the goods via Ningbo or Shanghai port.
      4.What is your payment terms?
      We accept 30% T/T in advance,70% in the period of shipment or 100% L/C.
      5.How should I contact you?
      You can contact us with Trade Manager or send us an email by click Contact Supplier bottom.
      6.What is the location of your company?
      Our company is located in the Taizhou Zhejiang Province, China.
      If you would like to have a visit, you are much welcome.
      7.How about the samples?
      We could send you the samples , most samples are free to send to most places in China.If sent to other countries, transport fee shoule be paid by you.
      8.Why choose us?
      1 Genuine produces with excellent quality and competitive price.
      2 Cooperating with the customers all over the world and knowing the markets very well.
      3 Zhuoxin is a listed company. Everything can be rest assured working with us.
      4 After- Services will be highly-satisfied. Any problems and feedbacks will be answered in a short of time.

      Installation & Testing

      ① Pipe cutting: according to the use requirements, after measuring the appropriate length, the required pipe can be cut by hand or machine. When cutting, keep both ends vertical and flat, and use a file to cut Deburring and sharp edge, but the chamfer should not be too large.

      ② Bonding of pipes and fittings: before bonding, trial assembly must be carried out, installation position must be determined and marked, length of inserted pipe end (socket depth + 10mm) and inner wall of socket of pipe fittings shall be cleaned,Then wipe with cotton yarn stained with acetone. After acetone volatilizes, evenly brush the adhesive on the outside of pipe end and inside of socket. It should not be too thick, but it should not be missed. Insert after painting and rotate. To the ideal combination angle required for installation, make all the pipes inserted into the socket, fix them by themselves after about 2 to 3 minutes, and wipe off the excess adhesive overflowing from the bonding place to keep the pipe clean. Now cut.Do not force to open or rotate the direction, otherwise it will cause leakage. The adhesive component shall not be subjected to external force within 1 hour, and shall not be watered within 24 hours. The test can be conducted only after the curing time is completed.

      ③ The pipeline installation must have a reliable seal to ensure that there is no leakage in the process of use. Fixing devices (pipe clamps) shall be installed every 1.5m to 2.0m.

      ④ Because the plastic pipe has certain plasticity, when the horizontal pipe is installed, the bracket or elevator is set every 0.6m to prevent the plastic pipe from deformation and affect the use.

      ⑤ The water supply pipe shall be far away from the heat source, and the clear distance between the riser and the stove edge shall not be less than 400mm, and the clear distance between the riser and the heating pipe shall not be less than 200mm.

      ⑥ After construction, the pipe can be sealed with soil only after passing the pressure test.

      ⑦ Please refer to the relevant construction specifications of the Ministry of construction for specific installation and use.