4 in x 10 ft solid pvc DWV drain waste vent pipe schedule 40

4 in x 10 ft solid pvc DWV drain waste vent pipe schedule 40
Item NO: Drain

4 in x 10 ft solid pvc DWV drain waste vent pipe schedule 40 is based on polyvinyl chloride resin as the main raw material, then add the right amount of stabilizer, lubricants, fillers, toner and other plastic extrusion molding and injection molding, and then after the cooling , Curing, stereotypes, inspection, packaging and a series of processes made a pipe.

Order

    Quick Help: Contact one of our experts and we'll get back to you in 24 hours!

    Order

      Quick Help: Contact one of our experts and we'll get back to you in 24 hours!

      YouTube
      Instagram
      WhatsApp

      Application

      Construction pipeline system

      Agricultural irrigation pipeline system

      Pool pipeline system

      Industrial pipeline system

      Water treatment pipeline system

      Fishery aquaculture pipeline system

      Advantages

      The characteristics of PVC material: stable physical properties, and not suitable for acid and alkali corrosion, relatively heat-resistant. By adding different additives, PVC materials can present different physical and mechanical properties

      Benefits
      Long service life
      Electrical insulation
      Good impact elasticity
      Good chemical resistance
      Easy to operate
      light in weight
      Description Size(mm) PCS/BAG
      PVC DRAINAGE PIPES 1-1/4″×2.0 10
      1-1/2″×2.2 6
      2″×2.3 4
      3″×3.2 2
      4″x3.2 1
      6″x3.6 1
      Attribute PVC drain
      Material UPVC
      Brand Name SAM-UK
      Standard ASTM D2241
      Size 1-1/4″~6″
      Thickness 2.0-3.6(mm)
      Color White
      Length 20   ft or customized
      Packing Nylon   bag or customized
      Technology Extrusion
      Connection Socket with glue
      Working   Temperature 0℃~45℃
      Working   Pressure
      Delivery   Medium 30~45   days after despoit
      OEM and ODM Yes
      Sample Fee Negotiated
      Application Drainage Water   Systerm
      Type thermoplastic pipes
      Density 1.35~1.46 g/cm³
      Water absorption rate 0.1~0.3 %
      Shrinkage rate 0.4~0.6 %
      tensile strength 41~50Mpa
      hardness hard tube

      1. Pipe is light and easy to construct. It is only 1/5 of cast iron pipe. Its standard length (20ft, 10ft) is longer than cast iron pipe, which reduces the number of interfaces.

      2. Good drainage performance

      The diameter of PVC drainage pipe can be smaller than that of cast iron pipe, which can increase the net height of space, which is more advantageous for users and enhances the use function of the building.

      3: Economy and Beauty

      PVC drain pipes usually have white exterior walls and are easy to clean without being painted with red dye, silver powder and other anticorrosive treatment.

      4. Good Social Benefits

      PVC drainage pipe can replace other steel drainage pipes in a wide range, and greatly reduce energy consumption in steelmaking process.

      5. Superior physicochemical properties

      The chemical property of PVC drainage pipe is stable, and its special mechanical and physical properties enable it to be used normally for 50 years. At the same time, its corrosion resistance, aging resistance and wear resistance make it more stable than drainage cast iron pipe and cement pipe for a long time.

      Installation & Testing

      ① Pipe cutting: according to the use requirements, after measuring the appropriate length, the required pipe can be cut by hand or machine. When cutting, keep both ends vertical and flat, and use a file to cut Deburring and sharp edge, but the chamfer should not be too large.

      ② Bonding of pipes and fittings: before bonding, trial assembly must be carried out, installation position must be determined and marked, length of inserted pipe end (socket depth + 10mm) and inner wall of socket of pipe fittings shall be cleaned,Then wipe with cotton yarn stained with acetone. After acetone volatilizes, evenly brush the adhesive on the outside of pipe end and inside of socket. It should not be too thick, but it should not be missed. Insert after painting and rotate. To the ideal combination angle required for installation, make all the pipes inserted into the socket, fix them by themselves after about 2 to 3 minutes, and wipe off the excess adhesive overflowing from the bonding place to keep the pipe clean. Now cut.Do not force to open or rotate the direction, otherwise it will cause leakage. The adhesive component shall not be subjected to external force within 1 hour, and shall not be watered within 24 hours. The test can be conducted only after the curing time is completed.

      ③ The pipeline installation must have a reliable seal to ensure that there is no leakage in the process of use. Fixing devices (pipe clamps) shall be installed every 1.5m to 2.0m.

      ④ Because the plastic pipe has certain plasticity, when the horizontal pipe is installed, the bracket or elevator is set every 0.6m to prevent the plastic pipe from deformation and affect the use.

      ⑤ The water supply pipe shall be far away from the heat source, and the clear distance between the riser and the stove edge shall not be less than 400mm, and the clear distance between the riser and the heating pipe shall not be less than 200mm.

      ⑥ After construction, the pipe can be sealed with soil only after passing the pressure test.

      ⑦ Please refer to the relevant construction specifications of the Ministry of construction for specific installation and use.