INSIDE ANGLE
Item NO: Y007

Order

    Quick Help: Contact one of our experts and we'll get back to you in 24 hours!

    Order

      Quick Help: Contact one of our experts and we'll get back to you in 24 hours!

      YouTube
      Instagram
      WhatsApp

      Application

      Piping networks for Rain water treatment in house building.

      Install on the eaves to collect rainwater

      Rainwater discharge

      Advantages

      After chlorination, the PVC resin increases the chemical stability, thereby improving the material’s heat resistance, acid, alkali, salt, oxidant, etc. corrosion. The maximum service temperature of CPVC can reach 110 ℃, and the long-term service temperature is 95 ℃.

      Benefits
      Long service life  

      Electrical insulation

      Good heat preservation

      Good chemical resistance

      Easy to operate

      light in weight

      Impact resistance

      High flame retardant

      Installation & Testing

      1. Level the rain gutter installation position, and use ink to flick the line from the beginning to the end.

      2. Take out the rain gutter from the packing bag, place the rain gutter steadily on the ground or on the scaffold, and place the rain gutter horizontally under the rain gutter, use a cutting machine to cut one and

      The rainwater bucket has a hole the same size as the spout.

      3. Slowly insert the rainwater bucket into the rainwater trough to the launching position.

      4. Install the hanger on the rain gutter; insert in order and master the spacing, the distance between two adjacent hangers is 40~45CM;

      5. Use an electric drill (No. 6 drill bit) to make holes at the position of the elastic line at a distance of 40~45cm, and knock into the expansion tube.

      6. Place the rain gutter at the position where the line has been stretched, adjust the spacing of the “splices”, and then fix the lifter and rain gutter with ∮4X40 stainless steel screws.

      7. When encountering the corner of the rain gutter, you need to use a “clip connector” to connect the “external corner” and “inner angle”, and the connection part of the rain gutter and the rain gutter also needs to be connected with a “clip connector”.

      8. During the installation of the rain gutter, in order to prevent water leakage, glass glue and PVC glue must be applied to the corresponding accessories such as the lock device and the card connector.